Proper labeling of electrical panels saves lives. They know which switch controls what in an emergency, makes the job of both technicians and maintenance crews easier. Especially in extensive facilities, there may be dozens of switches controlling similar machines.

That’s why panel schedule are essential. Whoever comes – whether a new electrician or a team coming for repairs – should be able to understand which switch does what immediately. This way, there is no risk of incorrectly cutting or operating during maintenance. Moreover, thanks to the labels, emergency intervention can be done in seconds.

Panel Schedule Template
Panel Schedule Template

Panel Schedule Templates

What is a Panel Schedule?

Before starting any job, electricians prepare a panel schedule. Working without this schedule is like groping in the dark. How much power each device draws and how much load the system can withstand are all written on this schedule.

Engineers use these schedules to calculate whether the system will be overloaded. Will a new machine be installed in the factory? The schedule is looked at first. Will the existing system withstand this? Will additional safety measures be required? Everything is determined here.

There are dozens of electrical panels in large workplaces. And many switches in each panel. Which switch operates which machine, how many amps it draws, and what the voltage values ​​are should be written on the schedule. Otherwise, the electrician performing maintenance will not know which one to turn off.

What Does a Panel Board Show?

The first thing an electrician who goes to a new workplace will want is a panel schedule. This chart shows which device is connected to where and how much power it draws. Here is what should be on the chart:

Labeling and Numbering

You will write the full name of each device on the board. “2nd-floor stairwell lamp”, “roof ventilation motor,” and “boiler room pump” – such abbreviations are not coded. If a fault occurs in the middle of the night, no one can decipher the code.

Also, give each circuit its own number. For example, the shops on the lower floor start with 1, the offices on the upper floor with 20. Every cable and every connection should be numbered so that there is no confusion. Thick cables for main lines and thin cables for lighting should all be clear on the chart.

Switch Dimensions

While sockets in the house are protected by a 16 amp fuse, a large elevator draws 40 amps. A lathe in a factory requires 100 amps, and cold storage requires 250 amps. A switch is selected according to the current drawn by each device, and the cable thickness is determined accordingly.

Phase Distribution

Single phase is common in homes – most appliances from TVs to refrigerators operate on a single phase. The situation is different in workplaces. For example, the carpenter in our neighborhood has three-phase motors in his workshop. Without three phases, the lathe won’t turn, the planer won’t work. The same goes for the restaurant next door – the industrial oven needs three phases.

Why Are Panel Schedules So Important?

Makes Work Easier

An electrician can only work with a panel schedule. This schedule is like a road map. Which cable goes where, which switch operates what – all are determined from here. In this way, there is no loss of time, and errors are prevented.

Load Calculation

Electricity consumption peaks in the evenings and on weekends. The system must withstand this load. Thanks to the panel schedule, engineers can calculate how much load will be on at which hour.

Possibility of Expansion

Are you going to buy a new machine for your workplace? First, look at the schedule. Which line lifts and where it should be pulled – all are determined from here. Otherwise, the system will be overloaded, and even a fire may occur.

Spare Switches

There will be a spare switch in every panel. These should be labeled as “spare” and kept closed. Otherwise, someone may say, “this is empty,” and open it, and the system will be messed up. Moreover, there is a risk of fire.

Possibility of Savings

You can balance power consumption thanks to the schedule. You can distribute loaded machines at different hours. In this way, your electricity bill will not increase.

Emergencies

God forbid a fire breaks out. Which switch will the firefighter turn off? Or which line will the maintenance worker cut? Without a schedule, disaster is a recipe.

Work Safety

OSHA standards require a panel schedule because most workplace accidents are electrical. Correct labeling and a proper schedule save lives.

Ease of Maintenance

Let’s say a new electrician comes in. If there is a panel schedule, he can figure out the system in 5 minutes. Otherwise, he will spend hours trying, and he may make mistakes.

Inspection and Control

Insurance companies and labor inspectors always want a schedule. A proper schedule = low risk = low insurance premium.

Time-Saving

When everything is labeled, there is no waste of time. Which switch, which fuse – can be found in 5 seconds. This is very important in an emergency.

How to Prepare a Panel Schedule?

To prepare a professional panel schedule, first remove all the loads from the system. Blank paper, Excel – it doesn’t matter. The important thing is to go regularly. Here’s what to do step by step:

List All Loads

First, count every lamp, outlet, and appliance in the building
How many machines are on each floor, what the elevator draws – write it all down
Everything from teapots to air conditioners uses electricity – don’t skip it

Determine Load Types

  • Resistive Loads: Heaters, ovens, lamps – convert electricity to heat
  • Inductive Loads: Motors, air conditioners – create magnetic fields
  • Capacitive Loads: Electronics, computers
  • Mixed Loads: Radios, televisions – use more than one type of energy

Detail Each Load

  • Lamp draws 0.5 amps
  • Air conditioner 10-15 amps
  • Elevator 30-40 amps
  • Factory machines 100 amps and above
  • Note the voltage values

Group the Devices

  • Critical Loads: Should never be disconnected (like hospital equipment)
  • Normal Loads: Can be cut for short periods
  • General Loads: Can be stopped for long periods
  • Consider separate panels for each group

Calculate Power Consumption

  • Write daily working hours
  • Determine peak hours
  • Calculate total load
  • Leave spare capacity

Note Special Situations

  • Devices to be connected to the generator
  • Places requiring UPS
  • Those requiring special voltage
  • Sensitive devices

Label

  • Number each switch
  • Name the panels
  • Mark spare switches
  • Add emergency instructions

Types of Electrical Panel Schedule

We can examine panels in three main groups. Each has a different area of ​​use and purpose. Here are the details:

Main Distribution Panels

We do not see these in normal apartments. They distribute the main electricity of the building. The main electricity line entering the apartment is connected here. Then, it is distributed to each apartment, elevator, and common area from here. It used to be made with a single column; now, double columns are preferred because it is easier to track faults.

Data Panels

Don’t just say skyscraper, the whole building is standing with these panels. The switchboard is here, the security cameras are here, the main internet distribution is here. If a single connection goes down, everyone’s work stops. The boss can’t access his computer, the secretary can’t send e-mails, even the security doors don’t work.

Each cable and each system has its own color code here. The camera system is marked with yellow, the fire alarm cables are red-taped. The elevator emergency phone is labeled green. Everything is coded so that there is no confusion. Even the new electrician who comes on the night shift can immediately understand which cable goes where.

You should write the labels accordingly: “Security Center Main Line,” “Entrance Turnstile System,” and “Parking Camera Group” – it will be clear and obvious. Not abbreviations or numbers. If there is a fire or theft, even minutes matter.

Subpanels

You see them on every floor, sometimes in apartments. It distributes the electricity coming from the main panel to the rooms. Which fuse protects what, which line goes where – all are written on the schedule.

Continuous and Non-Continuous Loads

We examine the electricity consumption in the building in two groups. The first is those that are constantly on – like lamps and refrigerators. The second is those that are occasionally on – like ovens and air conditioners. Those that are constantly on have low amperage, while others draw a lot of amperage.

Efficiency and Power Factor

Each device operates at a different efficiency. For example, an air conditioner converts 90% of electricity into cooling. The rest is lost as heat. There is also the power factor – the issue of reactive power. Electricians pay great attention to this. Excessive reactive power increases the bill.

Calculation Methods

When making panel calculations, we only take some things as 100%. Because no device operates at full power, it usually takes between 80-90%. There is also simultaneity. For example, only some operate the washing machine at the same time. Therefore, we calculate the total power accordingly.

Free Fillable and Ready to Use Panel Schedule Templates

Every electrician faces the same problem —preparing a correct and organized panel schedule. Whether it is a small market or a large factory, work can only be done with a good schedule. This is where we come in. We make your job easier with the templates we have prepared specifically for you.

We have put what we have learned from the masters working in the field for years into ready-made forms for you. We have made formula tables for those who are good at Excel and added simple templates for those who prefer Word. There are also printable files for those who say, “Let it be a PDF, I’ll print it out.”

For example, if you are going to install apartment electricity – there is a form for that. Or if you are going to open a market, you are going to set up a small board – we have added another example for that. All of them are taken from real projects, examples that have been tested in the field. They need to prepare things on a desk. We have transferred everything the masters experienced and what they paid attention to into these forms.